The supply of Aerated Blocks is currently suffering due to the reduced availability of ash.
A number of block manufacturers are having to source alternative raw materials, resulting in factories having to make modifications to their processing plants to ensure that blocks continue to be produced to the same quality and strength.
During this transition period volumes of blocks being delivered to sites and Merchants’ yards are being reduced. It is hoped that this is a short term situation and full deliveries will be resumed quickly but, in the meantime, it is having a serious effect on stock levels.
We are able to offer alternative solutions which will meet both your build requirements and the relevant U values. This is achieved by using a different block and adjusting either the insulation or internal finish, or in some instances both. View alternative solutions
We have good stocks of these alternative products within our branch network and are confident that we can continue to help you build, both throughout the transition period and beyond.
If you need additional advice or are having issues with your block supply please talk to us. In addition to your local branch team, our brick and block specialists, Helen & Sam are available to take your calls - they can be reached on 023 3038 5385